Dina Zhenisovna Kairbekova
Førsteamanuensis II i industriell økonomi
Kontakt
E-post: dina.kairbekova@uis.no
Avdeling
Det teknisk-naturvitenskapelige fakultet
Institutt for sikkerhet, økonomi og planlegging
Førsteamanuensis II i industriell økonomi
E-post: dina.kairbekova@uis.no
Avdeling
Det teknisk-naturvitenskapelige fakultet
Institutt for sikkerhet, økonomi og planlegging
Kayrbekova, Dina; Markeset, Tore; Panesar, Sukhvir Singh
(2012)
Identification of factors causing time and cost overruns in offshore petroleum modification projects. I: Advances in Production Management Systems. Value Networks: Innovation, Technologies, and Management.Springer Science+Business Media B.V..
ISBN 978-3-642-33979-0.
s.268-275.
Ravnestad, Guro; Panesar, Sukhvir Singh; Kayrbekova, Dina; Markeset, Tore
(2012)
Improving periodic preventive maintenance strategies using condition monitoring data. I: Advances in Production Management Systems. Value Networks: Innovation, Technologies, and Management.Springer Science+Business Media B.V..
ISBN 978-3-642-33979-0.
s.260-267.
Homlong, Eirik; Kayrbekova, Dina; Panesar, Sukhvir Singh; Markeset, Tore
(2012)
Assessing maintenance time, cost and uncertainty for offshore production facilities in arctic environment. I: Advances in Production Management Systems. Value Networks: Innovation, Technologies, and Management.Springer Science+Business Media B.V..
ISBN 978-3-642-33979-0.
s.222-232.
Kayrbekova, Dina; Barabadi, Abbas; Markeset, Tore
(2011)
Maintenance cost evaluation of a system to be used in Arctic conditions: a case study.Journal of Quality in Maintenance Engineering.
ISSN 1355-2511.
Volum 17.
Hefte 4.
s.320-336.
Kayrbekova, Dina; Markeset, Tore; Ghodrati, Behzad
(2011)
Activity-based life cycle cost analysis as an alternative to conventional LCC in engineering design.International Journal of System Assurance Engineering and Management.
ISSN 0975-6809.
Volum 2.
Hefte 3.
s.218-225.
Kayrbekova, Dina; Markeset, Tore
(2011)
Non-Conventional Cost Methods in Engineering Decision-Making in Equipment Selection Process. I: Twentieth International Symposium on Mine Planning and Equipment Selection MPES 2011.
ISBN 978-601-7146-14-6.
Kayrbekova, Dina; Markeset, Tore
(2010)
Economic decision support for offshore oil and gas production in arcticconditions : identifying the needs. I: Reliability, risk and safety : back to the future.
CRC Press.
ISBN 978-0-415-60427-7.
s.1274-1279.
Kayrbekova, Dina; Markeset, Tore
(2009)
Life cycle cost analysis in design of oil and gas production facilities to be used in harsh, remote and sensitive environments. I: Numerical and experimental study of a reliability measure for dynamic control of floating vessels.
CRC Press.
ISBN 978-0415-48792-4.
s.2955-2961.
Kayrbekova, Dina; Markeset, Tore
(2011)
Non-Conventional Cost Methods in Engineering Decision-Making in Equipment Selection Process.
Twentieth International Symposium on Mine Planning and Equipment Selection MPES 2011;
2011-10-12 - 2011-10-14.
Kayrbekova, Dina; Panesar, Sukhvir Singh; Markeset, Tore
(2011)
Offshore Petroleum Modification Projects: Identification of Factors Causing Time and Cost Overruns.
International Conference on Advances in Production Management Systems (APMS2011);
2011-09-26 - 2011-09-28.
Homlong, Eirik; Kayrbekova, Dina; Panesar, Sukhvir Singh; Markeset, Tore
(2011)
Offshore Production Facilities in Arctic Environment: Assessment of Maintenance Time, Cost and Uncertainty.
International Conference on Advances in Production Management Systems (APMS2011);
2011-09-26 - 2011-09-28.
Ravnestad, G.; Kayrbekova, Dina; Panesar, Sukhvir Singh; Markeset, Tore
(2011)
Periodic Preventive Maintenance Strategies: Improving Strategies using Condition Monitoring Data.
International Conference on Advances in Production Management Systems (APMS2011);
2011-09-26 - 2011-09-28.